Hi, I am using sas 9.4 management console. I have deployed a job and seems in the "TriggerOptions", i cannot specific a time myself in the calandar name. There is only something like First_monday_of_month. How could I schedule the job with a specific time?
->
Thanks
Have you tried entering a time in the hours and minutes boxes? For example if you want your job to run at 06:30 in the morning, put 6 into the hours box and 30 into the minutes box.
Sorry but I don't understand what you mean - "No, it doesnt have any changes on the interface". I use LSF and it has a very similar interface. Specifying the hours and minutes means that the job runs at that time of the day on every day matching the selected interval - for example every Monday or the first day of each month.
If you have a different requirement please explain - do you want different times on different days?
Join us for SAS Innovate 2025, our biggest and most exciting global event of the year, in Orlando, FL, from May 6-9.
Lock in the best rate now before the price increases on April 1.
Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.
Find more tutorials on the SAS Users YouTube channel.