It is not entirely clear what missing attribute or setting you are referring to. Can you elaborate, maybe include a screen shot?
I do have two broad remarks related to this part of the schedule definitions:
1) The LSF license that comes with SAS is not a "full" license. It is aimed at defining schedules from within SMC. And SMC by no means contains teh full set of Flow editor capabilities. Flow editor is not even part of that license. Would one change a schedule with a proper full LSF license using Flow Editor than SMC would not know about these changes and a discrepency is created. Rescheduling from SMC would overwrite all your changes.
2) The "Actions after the state of the flow is determined" attribute was ignored in older SAS 9.4 releases. This was hotfixed in later release (IIRC 9.4M2) and fixed in subsequent 9.4 maintenance release. Also, there are 4 options in LSF but only 3 in SMC ("Stop the flow and kill running work items" is missing). Maybe you are running an older SAs release and this is bothering you?
Regards,
-- Jan