Hi, I am using sas 9.4 management console. I have deployed a job and seems in the "TriggerOptions", i cannot specific a time myself in the calandar name. There is only something like First_monday_of_month. How could I schedule the job with a specific time?
->
Thanks
Have you tried entering a time in the hours and minutes boxes? For example if you want your job to run at 06:30 in the morning, put 6 into the hours box and 30 into the minutes box.
Sorry but I don't understand what you mean - "No, it doesnt have any changes on the interface". I use LSF and it has a very similar interface. Specifying the hours and minutes means that the job runs at that time of the day on every day matching the selected interval - for example every Monday or the first day of each month.
If you have a different requirement please explain - do you want different times on different days?
Are you ready for the spotlight? We're accepting content ideas for SAS Innovate 2025 to be held May 6-9 in Orlando, FL. The call is open until September 25. Read more here about why you should contribute and what is in it for you!
Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.
Find more tutorials on the SAS Users YouTube channel.