Hi,
I am using daily time event to run flows daily basis. but once flow completed successfully flow not triggering next day based on time event.
below are 2 methods to schedule the flow, but run now works only for one time run. is any other ways to schedule the flows to run daily bases based on time event.
1) Run Now - Running only for one time.
2) Manually in Flow Manager- Run manually.
What properties does the flow have in Flow Manager?
Hi LinusH, Thanks for your reply.
Flow property triggering based on daily time event. as reported scheduled flow running only one time next day it's not triggering automatically without reschedule the flow again. any options do i need to select for daily run in SMC or LSF?
Yes, but what does the properties say in Flow manager???
Have you selected the scheduling server?
Join us for SAS Innovate 2025, our biggest and most exciting global event of the year, in Orlando, FL, from May 6-9. Sign up by March 14 for just $795.
Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.
Find more tutorials on the SAS Users YouTube channel.