BookmarkSubscribeRSS Feed
chirumalla
Calcite | Level 5

Hi,

I am using daily time event to run flows daily basis. but once flow completed successfully flow not triggering next day based on time event. 

below are 2 methods to schedule the flow, but run now works only for one time run. is any other ways to schedule the flows to run daily bases based on time event.

1) Run Now - Running only for one time.

2) Manually in Flow Manager- Run manually.

4 REPLIES 4
LinusH
Tourmaline | Level 20

What properties does the flow have in Flow Manager?

Data never sleeps
chirumalla
Calcite | Level 5

Hi LinusH, Thanks for your reply.

Flow property triggering based on daily time event.  as reported scheduled flow running only one time next day it's not triggering automatically without reschedule the flow again. any options do i need to select for daily run in SMC or LSF?

LinusH
Tourmaline | Level 20

Yes, but what does the properties say in Flow manager???

Data never sleeps
DBailey
Lapis Lazuli | Level 10

Have you selected the scheduling server?

sas-innovate-2024.png

Join us for SAS Innovate April 16-19 at the Aria in Las Vegas. Bring the team and save big with our group pricing for a limited time only.

Pre-conference courses and tutorials are filling up fast and are always a sellout. Register today to reserve your seat.

 

Register now!

How to connect to databases in SAS Viya

Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.

Find more tutorials on the SAS Users YouTube channel.

Discussion stats
  • 4 replies
  • 1313 views
  • 0 likes
  • 3 in conversation