Hi @AmyR , I think you are correct about the 1 (I am too used to treating time as a categorical variable so that I can fit a covariance structure to it), but I believe you still need the ResilTot term in your estimate statement, as the parameter estimate for time*ResilTot is an estimate of the deviation in slope from the ResilTot estimate. And you should have 3 separate estimate statements, because as @jiltao pointed out, your current syntax provides a joint test, rather than individual tests.
... View more