Hi All.

I work with SAS Viya 4. In the past I scheduled the flow. In the first job, I check one crucial condition. If it is not fulfilled, then I put the syscc macrovariable as 1. It causes the job to terminate with status "Canceled" as it is a expected. However, after Viya upgrade, it doesn't stop the whole flow from continuing. The event expression between jobs within this flow is set to "success". Does anyone know the method to stop flow? However, I prefer to not apply any solution which will cause the job to terminate with status "Failed". Thank you in advance for any advise.

1 REPLY 1
LinusH
Tourmaline | Level 20
Sorry, I don't think I can help you with this specific problem.
But if you experience change in behaviour avfter an upgrade, I think you could approach SAS tech support with this inquiry.