BookmarkSubscribeRSS Feed
rusyba
Calcite | Level 5
Hello all!

I'm using LSF JobScheduler. I describe the flow in the SMC editor. How do I specify that the flow should stop its execution if a error was completed at least one job?

Yuri.
5 REPLIES 5
twocanbazza
Quartz | Level 8
In SMC One way is through the job dependancies in the flow. and/or using the attributes tab in the properties of the flow.

Barry
rusyba
Calcite | Level 5
On the Attributes tab is not such a possibility ((
But in "Flow Editor" have this option. In 9.2, Flow editor replaced by SMC.
twocanbazza
Quartz | Level 8
But in "Flow Editor" have this option. In 9.2, Flow editor replaced by SMC"

???
rusyba
Calcite | Level 5
Flow editor has this option.
In the SMC 9.2 is not an option. Message was edited by: rusyba
twocanbazza
Quartz | Level 8
Sorry, I am now a little confused.

What is "Flow Editor"? Are you talking about "Flow Manager".

I am using 9.2 and in SMC I have the option I mentioned, visable on the attributes tab of the properties of the Flow. Am mistaken on what you are asking for?

Barry

sas-innovate-2026-white.png



April 27 – 30 | Gaylord Texan | Grapevine, Texas

Registration is open

Walk in ready to learn. Walk out ready to deliver. This is the data and AI conference you can't afford to miss.
Register now and lock in 2025 pricing—just $495!

Register now

What is Bayesian Analysis?

Learn the difference between classical and Bayesian statistical approaches and see a few PROC examples to perform Bayesian analysis in this video.

Find more tutorials on the SAS Users YouTube channel.

SAS Training: Just a Click Away

 Ready to level-up your skills? Choose your own adventure.

Browse our catalog!

Discussion stats
  • 5 replies
  • 1621 views
  • 0 likes
  • 2 in conversation