BookmarkSubscribeRSS Feed
rusyba
Calcite | Level 5
Hello all!

I'm using LSF JobScheduler. I describe the flow in the SMC editor. How do I specify that the flow should stop its execution if a error was completed at least one job?

Yuri.
5 REPLIES 5
twocanbazza
Quartz | Level 8
In SMC One way is through the job dependancies in the flow. and/or using the attributes tab in the properties of the flow.

Barry
rusyba
Calcite | Level 5
On the Attributes tab is not such a possibility ((
But in "Flow Editor" have this option. In 9.2, Flow editor replaced by SMC.
twocanbazza
Quartz | Level 8
But in "Flow Editor" have this option. In 9.2, Flow editor replaced by SMC"

???
rusyba
Calcite | Level 5
Flow editor has this option.
In the SMC 9.2 is not an option. Message was edited by: rusyba
twocanbazza
Quartz | Level 8
Sorry, I am now a little confused.

What is "Flow Editor"? Are you talking about "Flow Manager".

I am using 9.2 and in SMC I have the option I mentioned, visable on the attributes tab of the properties of the Flow. Am mistaken on what you are asking for?

Barry

sas-innovate-wordmark-2025-midnight.png

Register Today!

Join us for SAS Innovate 2025, our biggest and most exciting global event of the year, in Orlando, FL, from May 6-9. Sign up by March 14 for just $795.


Register now!

What is Bayesian Analysis?

Learn the difference between classical and Bayesian statistical approaches and see a few PROC examples to perform Bayesian analysis in this video.

Find more tutorials on the SAS Users YouTube channel.

SAS Training: Just a Click Away

 Ready to level-up your skills? Choose your own adventure.

Browse our catalog!

Discussion stats
  • 5 replies
  • 1247 views
  • 0 likes
  • 2 in conversation