BookmarkSubscribeRSS Feed
bigbigben
Obsidian | Level 7

Hi, there:

 

I run into some convergence issues when using proc model to estimate a highly nonlinear model. I tried to start from different starting point (using the option startiter) and raise the convergence criteria (for example, change the value from 0.000001 to 0.001), but nothing has worked. One hint I can get from the program is that the RPC value is always missing. Does it tell me something? In addition, I looked the correlation matrix of the explanatory variables. Although there are some eigenvalues are very small, but they are not too small.

 

Any input is highly appreciated.

2 REPLIES 2
ballardw
Super User

Showing the code of the model you ran may help.

 

Also some of the output. It may be something like number of observations is insufficient or something else data related that we really would be guessing in the dark at this point.

bigbigben
Obsidian | Level 7

Hi, there:

 

The model is fairly complicated. There are about 1 million observations and I checked the variance covariance matrix of the explanatories is full rank. However, the computation of RPC is missing, but everything else can show. That makes me wonder what it tells me.

SAS Innovate 2025: Register Now

Registration is now open for SAS Innovate 2025 , our biggest and most exciting global event of the year! Join us in Orlando, FL, May 6-9.
Sign up by Dec. 31 to get the 2024 rate of just $495.
Register now!

What is Bayesian Analysis?

Learn the difference between classical and Bayesian statistical approaches and see a few PROC examples to perform Bayesian analysis in this video.

Find more tutorials on the SAS Users YouTube channel.

SAS Training: Just a Click Away

 Ready to level-up your skills? Choose your own adventure.

Browse our catalog!

Discussion stats
  • 2 replies
  • 1126 views
  • 2 likes
  • 2 in conversation