BookmarkSubscribeRSS Feed
blakeoft
Fluorite | Level 6

Hello,

 

I have a Forecast Studio project with a weekly time scale and thus the seasonal cycle length is 52. I've noticed that when I add an event to a copy of an automatically generated Subset ARIMA model that has DIF = (1 52), the event is then assigned DIF = (53). All of the other events that have been automatically included in the model have the same differencing as the model, i.e. DIF = (1 52). To the best of my knowledge, an event's differencing should be the same as the model's differencing. Is there an explanation as to why it assigns DIF = (53) instead of (1 52)?

 

Thanks,

Blake

sas-innovate-2024.png

📢

ANNOUNCEMENT

The early bird rate has been extended! Register by March 18 for just $695 - $100 off the standard rate.

 

Check out the agenda and get ready for a jam-packed event featuring workshops, super demos, breakout sessions, roundtables, inspiring keynotes and incredible networking events. 

 

Register now!

Multiple Linear Regression in SAS

Learn how to run multiple linear regression models with and without interactions, presented by SAS user Alex Chaplin.

Find more tutorials on the SAS Users YouTube channel.

Discussion stats
  • 0 replies
  • 341 views
  • 0 likes
  • 1 in conversation