Hi,
I use several query tool and sas code in my project to produce a report for Web Report Studio by Stored Processes.
If I need to modify my report, I can modify the code of my s.p. or the project (and than rebuild the s.p.).
I know it's possible to produce a sas code for the whole project, and than synchronize it to the s.p.
Well, I was wandering if I can to link directly the project to the s.p. without to rebuild the sas code., so I change, e.g., a query builder and the s.p. is updated.
I use EG 4.2.
bye