hi,
Im not so much experienced yet but when I need to use "RUN BRANCH'' I have i problem: When that specific procesflow that I run, includes a datastep to IMPORT a file, that datastep will NOT run AUTOMTICALLY. Everytime. I need to run that step manually.
So i maybe found a workaround, and that is to use PROGRAM, to start running this branch and this specific import datastep. To make a long story short; is there a code that i can add in PROGRAM, to start running a specific datastep (in this case, an IMPORT DATASTEP)
Thanks!
Jonathan
To force a program in the flow to run before other steps, try adding a custom Link to connect the steps. Right-click on the program and select Link To:
Link it to the immediate next task that needs the program as a prerequisite:
When you run the flow, EG will ensure the linked objects run in sequence.
To force a program in the flow to run before other steps, try adding a custom Link to connect the steps. Right-click on the program and select Link To:
Link it to the immediate next task that needs the program as a prerequisite:
When you run the flow, EG will ensure the linked objects run in sequence.
Registration is now open for SAS Innovate 2025 , our biggest and most exciting global event of the year! Join us in Orlando, FL, May 6-9.
Sign up by Dec. 31 to get the 2024 rate of just $495.
Register now!
What’s the difference between SAS Enterprise Guide and SAS Studio? How are they similar? Just ask SAS’ Danny Modlin.
Find more tutorials on the SAS Users YouTube channel.
Ready to level-up your skills? Choose your own adventure.