Hi,
I'm using SAS EG 7.1 & creating Projects as usual.
I've found that I'm losing a lot of work due to Projects freezing or crashing which means I need to close down using CTRL AL DELETE & I can only recover my work at the last point I saved the Project.
Is there some code I can add somewhere so the Project saves every 5 minutes or so?
I usually remember but sometimes when I'm trying to concentrate on logic, I overlook saving & this is getting annoying.
Hope someone has a solution because they've had the same problem & can help me out. : )
Hi
Yes, had the same problem with EG 7.1 crashing at inopportune moments.
The auto save interval can be set in Tools > Options > Project Recovery > Save interval.
The default is set at 30 minutes.
HTH
Chris
Hi
Yes, had the same problem with EG 7.1 crashing at inopportune moments.
The auto save interval can be set in Tools > Options > Project Recovery > Save interval.
The default is set at 30 minutes.
HTH
Chris
Thanks Chris,
All the time I've been using EG & I've just found this out??
Much appreciated!
Don't miss out on SAS Innovate - Register now for the FREE Livestream!
Can't make it to Vegas? No problem! Watch our general sessions LIVE or on-demand starting April 17th. Hear from SAS execs, best-selling author Adam Grant, Hot Ones host Sean Evans, top tech journalist Kara Swisher, AI expert Cassie Kozyrkov, and the mind-blowing dance crew iLuminate! Plus, get access to over 20 breakout sessions.
What’s the difference between SAS Enterprise Guide and SAS Studio? How are they similar? Just ask SAS’ Danny Modlin.
Find more tutorials on the SAS Users YouTube channel.