Hi there,
I have several DI Studio jobs deployed and scheduled to run in a flow via Schedule Manager.
All jobs have configured: Status Handling - Condition 'Send Job Status' - Action 'Send Job Status' into a job status table.
If I run a single job in DI, it will send all below information into the table:
user, etl_table, lib, jobname, jobstat, rbefore, rafter, job_rc, sttime, endtime.
If the jobs run via Schedule Manager in a scheduled flow with multiple jobs, it will not write anything into the job status table.
Does anyone have any idea why?
Any help would be greatly appreciated.
Thank you!
First thing I'd be doing is look into the Job logs of a job where things work as expected and where things don't work. What's the difference?
And just asking: This job status table isn't in WORK - right?
%macro etls_sendJobStatus doesn't appear at all in job logs from Job Scheduler run. And it appears when I run the job manually.
The library where the status table is appears as assigned in logs from Job Scheduler run (it isn't a work table).
Join us for SAS Innovate 2025, our biggest and most exciting global event of the year, in Orlando, FL, from May 6-9. Sign up by March 14 for just $795.
Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.
Find more tutorials on the SAS Users YouTube channel.