Hi, I am trying to write a code for a transshipment procurement model from 4 plants (Ps) via 3 transshipment nodes (Ts) to 4 destination distribution centers (DCs).
The conditon is that each node in the inflow (from Ps to Ts) and outflow (from Ts to Ds) variables need to be a multiple of 3.
I have tried to do that via introducing the "lot" variable, however it doesn't work correctly when I use lot =3, but it does give a correct answer when lot size = 1.
Can someone kindly, help point out the mistake I am making. Thank you.
My Current Code -
proc optmodel;
set Ps ={'P1', 'P2', 'P3', 'P4'};
set Ds ={'D1', 'D2', 'D3', 'D4'};
set Ts ={'T1', 'T2', 'T3'};
number InCost{Ps, Ts} = [
39 29 43
40 35 43
48 44 31
37 39 30];
number OutCost{Ts, Ds} = [
34 17 36 25
30 47 16 15
29 22 21 23];
number Supply{Ps} = [37 34 20 28];
number Demand{Ds} = [18 15 21 3];
number TransshipmentCapacity {Ts} = [37 37 43];
number TransshipmentFixedCost{Ts} = [700 700 900];
number ProductionFixedCost{Ps} = [420 120 240 580];
var inflow {Ps, Ts} integer>=0;
var outflow{Ts, Ds} integer>=0;
number lot = 1;
var y{Ts} binary;
var a{Ps} binary;
number M=1000000;
number N=1000000;
minimize Z = sum{i in Ps}sum{j in Ts}(inflow[i,j]*lot)*InCost[i,j]+sum{j in Ts}y[j]*TransshipmentFixedCost[j]
+sum{i in Ps}a[i]*ProductionFixedCost[i]+sum{j in Ts}sum{k in Ds}(outflow[j,k]*lot)*OutCost[j,k];
con SupplyConst {i in Ps}:sum{j in Ts}(inflow[i,j]*lot) <= Supply[i];
con DemandConst {k in Ds}:sum{j in Ts}(outflow[j,k]*lot) >= Demand[k];
con NoStockConst{j in Ts}:sum{i in Ps}(inflow[i,j]*lot) = sum{k in Ds}(outflow[j,k]*lot);
con TsCapConst {j in Ts}:sum{i in Ps}(inflow[i,j]*lot) <= TransshipmentCapacity[j];
con linkingy {j in Ts}:sum{i in Ps}(inflow[i,j]*lot)<=M*y[j];
con linkinga {i in Ps}:sum{j in Ts}(inflow[i,j]*lot)<=N*a[i];
solve;
print inflow;
print outflow;
print y;
print a;
print Z;
print {j in Ts} (sum{i in Ps}inflow[i,j]);
print {j in Ts} (sum{k in Ds}outflow[j,k]);
quit;
Please post it at OR forum .
Ksharp..can u please share the link of the OR forum here?
See this recent thread.
SAS Innovate 2025 is scheduled for May 6-9 in Orlando, FL. Sign up to be first to learn about the agenda and registration!
Learn how to run multiple linear regression models with and without interactions, presented by SAS user Alex Chaplin.
Find more tutorials on the SAS Users YouTube channel.