BookmarkSubscribeRSS Feed
deleted_user
Not applicable
Maybe you could help me with my next problem. I need to manipulate the data generated from the output that you helped with. RMS{i}=21.1 is a code associated with a negative number (i.e. - 2.75). I need to subtract that number from the codes below.

Code
21.1 = Milling (Always Subtracted)
06 = Pavement (Always Added)
08 = Pavement (Always Added)
40 = Base (Ignored except when below milling)

Senario 1
Instance Code Depth
1 21.1 -2.75
2 08 1.00 2.1=sum(1:2) -1.75
3 40 1.00 3.1=sum(2.1:3) -0.75
4 06 0.50 4.1=sum(3.1:4) -0.25
5 08 0.75 5.1=sum(4.1:5) 0.50
6 40 6.00 6.1=sum(5.1:6) 0.50
7 08 2.75 7.1=sum(6.1:7) 3.25

Output = 3.50 Total Depth

Code So Far


DATA MILL1 ;
SET MILLA8;
BY CNTY SR SEG BEG_OFF;
ARRAY DPT{29} LAY_DT1-LAY_DT29;
ARRAY PAV{29} PAV_ST1-PAV_ST29;
ARRAY RMS{29} RMS_CD1-RMS_CD29;

DEPTH=0;
CODE=0;
flag = 0; * Reset flag;

OFF_LEN=END_OFF-BEG_OFF;
IF LAY_CD1='BRDK' OR LAY_CD2='BRDK' THEN DELETE;

DO I=1 TO 29 BY 1 UNTIL (CODE=21.2);
if RMS{i}=21.1 then flag = 1;
IF PAV{i} NE 'W' and flag = 1 THEN DO; *Starts processing after flag is set;
DEPTH=DPT{i}; CODE=RMS{i};
IF CODE=. THEN DELETE;
IF CODE=21.2 THEN DEPTH=0;
output;
END;
END;
RUN; Message was edited by: cpjeep

SAS Innovate 2025: Call for Content

Are you ready for the spotlight? We're accepting content ideas for SAS Innovate 2025 to be held May 6-9 in Orlando, FL. The call is open until September 25. Read more here about why you should contribute and what is in it for you!

Submit your idea!

Multiple Linear Regression in SAS

Learn how to run multiple linear regression models with and without interactions, presented by SAS user Alex Chaplin.

Find more tutorials on the SAS Users YouTube channel.

Discussion stats
  • 0 replies
  • 692 views
  • 0 likes
  • 1 in conversation