Hi,
Currently we have two developed SAS jobs in our SAS 9.4 Environment. We have a requirement that if first job fails , the second job should start. But the job should be in sequence.
SO , we have created a flow with Event type as 'Exit code Greater than zero' and schedule that job.
But if the first job fails with exit code as 3, the second job is still in waiting state. Its not getting triggered.
Is there any possible way to resolve this issue.