I am trying to create ensemble of 3 models:
1. Regression, cumulative events percentage captured at 20%: 56.8
2. Neural Network, cumulative events percentage captured at 20%: 59.3
3. SVM, cumulative events captured at 20%: 54.01
3. Decision Tree, cumulative events captured at 20%: 48.05
Ensemble, cumulative results captured at 20%: 54.18
My target is binary. and In ensemble, I have set the posterior probability to maximum. So it will take the maximum probability out of all models, I believe.
... View more