Desktop productivity for business analysts and programmers

Using EG Code as basis for ETL job.

Reply
N/A
Posts: 1

Using EG Code as basis for ETL job.

I have created an Enterprise Guide project that does the bulk of the work in creating a table that I would like to turn into an ETL job. I would normally just schedule the project to run but am in a Clustered Linux Environment without LSF or SAS Grid. Has anybody ever used the code from an EG project as the user written code when creating an ETL job in Data Integration Studio? If so, how did it work? I know all the macro variables that are created specifically for EG would need to be removed.

Any thoughts and/or suggestions?

Thanks.
Ask a Question
Discussion stats
  • 0 replies
  • 84 views
  • 0 likes
  • 1 in conversation