I'm using EM 7.1 and the variable clustering node gives an error if the dataset has over 100,000 observations. I can sample the dataset, and then cluster my variables, but is there an easy way to pass along only the new clustered variables along with the full dataset (train, validate, test) to the models?
On the options for the node, look under "Stopping Criteria". There is an option called "Suppress Sampling Warning". Set it to "Yes" and your problem should be solved.
Join us for SAS Innovate April 16-19 at the Aria in Las Vegas. Bring the team and save big with our group pricing for a limited time only.
Pre-conference courses and tutorials are filling up fast and are always a sellout. Register today to reserve your seat.