Hi,
I am using daily time event to run flows daily basis. but once flow completed successfully flow not triggering next day based on time event.
below are 2 methods to schedule the flow, but run now works only for one time run. is any other ways to schedule the flows to run daily bases based on time event.
1) Run Now - Running only for one time.
2) Manually in Flow Manager- Run manually.
What properties does the flow have in Flow Manager?
Hi LinusH, Thanks for your reply.
Flow property triggering based on daily time event. as reported scheduled flow running only one time next day it's not triggering automatically without reschedule the flow again. any options do i need to select for daily run in SMC or LSF?
Yes, but what does the properties say in Flow manager???
Have you selected the scheduling server?
Don't miss out on SAS Innovate - Register now for the FREE Livestream!
Can't make it to Vegas? No problem! Watch our general sessions LIVE or on-demand starting April 17th. Hear from SAS execs, best-selling author Adam Grant, Hot Ones host Sean Evans, top tech journalist Kara Swisher, AI expert Cassie Kozyrkov, and the mind-blowing dance crew iLuminate! Plus, get access to over 20 breakout sessions.
Need to connect to databases in SAS Viya? SAS’ David Ghan shows you two methods – via SAS/ACCESS LIBNAME and SAS Data Connector SASLIBS – in this video.
Find more tutorials on the SAS Users YouTube channel.