Architecting, installing and maintaining your SAS environment

Second program in the job flow did not run and the log have few warnings.

Reply
New Contributor
Posts: 4

Second program in the job flow did not run and the log have few warnings.

I have deployed the Jobs and scheduled in aparticular time . The flow is after the program 1 executed the prog2 must run. But when we check the log. The first program has run and the second one did not.

 

When we run the sam program by using RunNow in schedul manager. Again new error is coming.Please find the enclosed images


errjob.jpgRUNNOW_log.jpgWarnings.jpg
Super User
Posts: 5,426

Re: Second program in the job flow did not run and the log have few warnings.

You obviously have a problem with the ODBC connection. From the tone of your post I assume you have limited knowledge of the program logic so I recommend you find someone / something that describes the connection, configuration, authorization etc.
Data never sleeps
New Contributor
Posts: 4

Re: Second program in the job flow did not run and the log have few warnings.

Thanks for the response. I am not aware of he program. I have scheduled the jobs. But it is running fine, when we run the program directly without scheduling the job.

Ask a Question
Discussion stats
  • 2 replies
  • 147 views
  • 0 likes
  • 2 in conversation