<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic how to use  joblet in DI 4.2 studio in SAS Enterprise Guide</title>
    <link>https://communities.sas.com/t5/SAS-Enterprise-Guide/how-to-use-joblet-in-DI-4-2-studio/m-p/21453#M3473</link>
    <description>In 4.2 we have the ability to create reusable jobs (joblets) that can be dropped into another job.  The actual job logic acts as a reference, that is if I change the inner job, all other jobs including it will get the change.  If I want to customize each job reference for the instance it is being used in, I can parameterize the inner job by putting macro variables wherever you want to specify some instance information, and surface those on the interface of the inner job.  Then when I drop the inner job inside of an outer job, you bring up the parameter tab and customize it as you need to.&lt;BR /&gt;
So can anybody give details about how to achieve this joblet feature.</description>
    <pubDate>Tue, 21 Apr 2009 10:10:33 GMT</pubDate>
    <dc:creator>deleted_user</dc:creator>
    <dc:date>2009-04-21T10:10:33Z</dc:date>
    <item>
      <title>how to use  joblet in DI 4.2 studio</title>
      <link>https://communities.sas.com/t5/SAS-Enterprise-Guide/how-to-use-joblet-in-DI-4-2-studio/m-p/21453#M3473</link>
      <description>In 4.2 we have the ability to create reusable jobs (joblets) that can be dropped into another job.  The actual job logic acts as a reference, that is if I change the inner job, all other jobs including it will get the change.  If I want to customize each job reference for the instance it is being used in, I can parameterize the inner job by putting macro variables wherever you want to specify some instance information, and surface those on the interface of the inner job.  Then when I drop the inner job inside of an outer job, you bring up the parameter tab and customize it as you need to.&lt;BR /&gt;
So can anybody give details about how to achieve this joblet feature.</description>
      <pubDate>Tue, 21 Apr 2009 10:10:33 GMT</pubDate>
      <guid>https://communities.sas.com/t5/SAS-Enterprise-Guide/how-to-use-joblet-in-DI-4-2-studio/m-p/21453#M3473</guid>
      <dc:creator>deleted_user</dc:creator>
      <dc:date>2009-04-21T10:10:33Z</dc:date>
    </item>
  </channel>
</rss>

